Existing customers purchasing on account must contact [email protected] for their contract pricing.
No Image
Available
FLEXTIME IMPACT-MEDIUM
Image may not reflect selected features
/vendors/4886/large/005-Flextime_01.png
additional image
FLEXTIME IMPACT-MEDIUM (005TPR-M) by Watson Gloves
Dryhide™ water resistant full-grain goatskin leather palm is hard wearing and durable providing great dexterity. Heavy duty rubber on back of hand, fingers and knuckle bar provides impact protection. Hooded fingertips and thumb for added reinforcement and protection in critical wear areas. Spandex stretch back is flexible and provides form-fitting memory. Touchscreen compatible fingertips can be used on all touch screen devices. Snug-fitting elastic wrist and secure Velcro® closure keeps out dirt and debris.
Downloads
Product Specification
Item #
005TPR-M
Dimensions
Additional product details
Vendor Item #
005TPR-M
Industrial Category
Safety
Industrial Subcategory
Gloves and Hand Protection
Industrial Subtype
Synthetic Gloves
Applications
Automotive, Construction, Equestrian, Gardening & Landscaping, General Purpose
Back Material
Spandex with TPR
Brand
Work Armour
Closure Type
Velcro®
Colour
Black/Tan
GTIN
065537865140
Item Height inches
1
Item Length inches
9
Item Quantity
1
Item Weight lbs
0.45
Item Width inches
4
Package Height inches
13.4
Package Length inches
25.6
Package Quantity
72
Package Type
BOX
Package Weight lbs
32.4
Package Width inches
13.4
Palm Material
Goatskin
Product Series
Work Armour
Short Description
Dryhide™ water resistant full-grain goatskin leather palm is hard wearing and durable providing great dexterity Spandex stretch back is flexible and provides form-fitting memoryLeather hooded fingertips and reinforced thumb.
Size
M
Spec Sheet
https://www.watsongloves.com/wp-content/uploads/2019/07/005TPR-Flextime_Spec-Sheet_NP.pdf
Thumb Type
Wing
UNSPSC
46181504
UNSPSC Number
46181504
Manufactured By
Watson Gloves


Other Details:
  • Dryhide™ water resistant full-grain goatskin leather palm
  • Heavy duty rubber on back of hand, fingers and knucle bar
  • Hooded fingertips and thumb
  • Snug-fitting elastic wrist
  • Spandex stretch back
GTIN
Additional options that would change other selections
Size
Additional options that would change other selections
Call for Price
Qty:
BASE PRICE:
$
0
00
/ / 1
($0.00 / 1)
Add To Cart
Add To Estimate
Add To Wishlist
Save To Compare
Availability:
  • Manufacturer availability unknown.
To: From: Subject:

© 2025 TT Liquid, 680 Tradewind Drive Unit 4, Ancaster, ON L9G 4V5 Phone: (905) 529-3861

Website Development by XOLOGIC